05

Testing of Electrical Installations up to 1 kV

The measurements and tests our laboratory performs. Afterwards we issue a test report that meets the requirements of Ukrainian law.

What’s included

  1. Insulation resistance measurement.
  2. Power-frequency high-voltage withstand test.
  3. Protection trip check for lines up to 1 kV with earthed neutral.
  4. Phasing of switchboards and their feeders.

Photos from our sites

Prices

Per measurement, UAH incl. VAT

№WorkPrice
01Insulation resistance measurement of wiring and electrical equipmentUAH 115.00
03Fault loop (phase–neutral) impedance measurementUAH 580.00