What’s included

  1. Inspection of underground cable routes.
  2. Inspection of cable ducts, tunnels and transformer substation shafts.
  3. Inspection of cable manholes.
  4. Inspection of cable terminations and joints above 1000 V.
  5. Oil level and leak checks on oil-filled apparatus.
  6. Inspection of transformer busbars and temperature checks of contact connections.
  7. Oil sampling and topping up oil in apparatus.
  8. Checking the silica gel indicator in transformer breathers.
  9. Inspection of transformers, insulators and busbars.