06

Metal-Clad Switchgear (KRU) Testing

The measurements and tests our laboratory performs. Afterwards we issue a test report that meets the requirements of Ukrainian law.

What’s included

  1. Insulation resistance measurement of primary and secondary circuits.
  2. Power-frequency high-voltage withstand test.
  3. DC resistance measurement.

Photos from our sites

Need this work done on your site? Call us — we’ll agree the scope and date.