10

On-Site Power Transformer Repair

The measurements and tests our laboratory performs. Afterwards we issue a test report that meets the requirements of Ukrainian law.

What’s included

  1. Transformer oil drying.
  2. Repair of the transformer’s active part (except inter-turn faults).
  3. Silica gel replacement.
  4. Transformer oil replacement.
  5. Gasket replacement.

Photos from our sites

Prices

Per measurement, UAH incl. VAT

№WorkPrice
08On-site repair of 6/10 kV power transformersfrom UAH 50,000.00

Need this work done on your site? Call us — we’ll agree the scope and date.